• Ensure there is enough space on both sides of the battery to facilitate the locking operation of
the screws on the side of the battery.
• When there are two sets of batteries (number of battery packs ≥ 4) installed, please ensure that
the minimum clearance between the two sets of batteries is 400mm.
• Reserve enough clearance around equipments to ensure sufficient space for installation and
heat dissipation.
≥300mm
≥300mm
≥300mm≥300mm
≥300mm
System
Installation
1406mm
183mm
175mm
588mm
455mm
380mm
• The installation and use environment must meet relevant international, national, and local
standards for lithium batteries, and are in accordance with the local laws and regulations.
• When installing the equipment in a garage, keep it away from the drive way.
• The mounting structure where the equipment is installed must be fire resistant. Do not install
the equipment on flammable building materials.
• Ensure that the installation surface is solid enough to bear the weight of the equipment.
680mm
612mm
≥2521mm
≥2461mm
≥1280mm
1436~1466mm
1009mm
1039~1069mm
642~672mm
-
20℃~50℃
0%~100%RH
Salt
Corrodition
Solvents
87°
~
93°
4|
Installation Environment
Requirements
Installation Space
Requirements
5.1kwh
10.2kwh
588mm
15.3kwh
≥300mm
≤3000m