EasyManua.ls Logo

Ecomiser SR-02 - Page 11

Ecomiser SR-02
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Caution
Installation work should be done by certified technicians. Before setting up the machine and tables,
check first whether power line, drain line, water supply line and detergent/rinse tubes are connected
properly without any problems.
6.1 The straight-through installation
- Before hooking up plumbing and power lines, install the machine in the desired location and level
using the feet. Then run the detergent/rinse lines to where the chemical containers are located.
- After connecting the table to the machine, check that the door is moving up and down without any
interference between machine and table.
6.2 The corner installation
- For a corner installation only, move the rack guide rail from the front position to the side position.
Ecomiser SR-02 / SR-03 Manual 11/24 Page Rev.06

Related product manuals