Do you have a question about the Econoline 36-1 DP and is the answer not in the manual?
Brand | Econoline |
---|---|
Model | 36-1 DP |
Category | Industrial Equipment |
Language | English |
Carefully inspect the blast cabinet for any damage incurred during transit.
Adhere to electrical codes, NEC, and OSHA. Avoid operating with doors open.
Cut straps, remove protective wrap, loosen from skid, and move unit.
Attach light fixture to cabinet top with protective sheet to prevent damage.
Loosen wing nuts, peel protective covering, and re-tighten to prevent leaks.
Position dust collector, connect hoses, and plug in power cord.
Connect regulator/gauge assembly to inlet ball valve using Teflon tape.
Connect black hose to air filter and red hose to media valve.
Connect compressor airline to regulator, noting valve open/closed positions.
Pour abrasive media into pressure pot, capacity up to 100 lbs.
Secure ball seal and slowly open air inlet valve to compress vessel.
Adjust metering valve for optimal abrasive mist for effective blasting.
Maintain 90-degree angle, 4-8 inches from surface, at 20-80 psi.
Replace nozzles/hoses, rebuild valves, check barbs, clean filters, and replace gaskets.
Select a capable compressor and use minimum 1/2" ID air lines for optimal performance.
Nozzle size dictates CFM. Record operational data for future reference.
Details on nozzle I.D.s, pressure ratings, and CFM requirements for blasting.
Covers material and workmanship defects; requires return of parts for repair/replacement.
Excludes misuse, specific parts, and use of silica-based abrasives like natural sand.