EasyManua.ls Logo

Econoline 36-1 DP - Assembly Instructions; Step 1: Unpacking and Skid Removal; Step 2: Light Fixture Installation; Step 3: Window Preparation

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DP 36-1
Assembly Instructions
PLEASE READ INSTRUCTIONS COMPLETELY
BEFORE STARTING
We thank you for purchasing the DP-36 pressure system. This system has
been specifically designed for the Dry Blast user who wishes to achieve
quality results on a number of surfaces for both low and high volume
requirements. Below you will find instructions on how to assemble your
unit upon receipt. If you have any questions on how to proceed with any
steps, contact Econoline Technical Service by phone at 1-800-253-9968
or fax at 1-616-846-6341.
NOTICE:
The DP36 is delivered skid-mounted to assure safe arrival. If any damage
is evident upon receipt, contact the carrier immediately to file your claim.
STEP 1 Unpacking
Cut the packing straps by using heavy-duty scissors or wire cutter.
Remove the protective plastic wrap and cardboard. Open the front
door by unlatching and remove the light assembly, regulator and foot
pedal. Using a crescent wrench, remove the bolts to loosen the unit
from the skid. With assistance of others, slide unit gently off the skid
and place unit in desired work area.
STEP 2 Light Fixture Installation
Unwrap the fluorescent light fixture and attach to the top of the
cabinet with hardware provided. Be sure to place the plastic
protective sheet between the light fixture and the cabinet to protect the
light source from abrasive damage during blasting
.
STEP 3 Window
Loosen wing nuts to remove window frame and peel protective covering
off from the window. Re-install and firmly tighten wing nuts to prevent
leakage around window.