EasyManua.ls Logo

EdilKamin ECOIDRO - Pre-Use Checklist; Installation & Setup Verification; Usage & Maintenance Verification; Pre-Ignition Checklist Reminder

EdilKamin ECOIDRO
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHECK LIST
Read the entire specifications before using this list
Installation and setup
- Installation carried out by the Dealer which has issued the guarantee and maintenance booklet.
- Room ventilation.
- The smoke duct/flue only receives smoke from the stove.
- The smoke duct has:
- no more than 2 bends.
- a horizontal section of no more than 2 metres.
- a vertical section of at least 1.5 metres.
- the outlet pipes are made of a suitable material (stainless steel is recommended).
- where pipes cross any flammable materials (e.g. wood) all precautions have been taken to avoid fire.
- Hydraulic system declaration of conformity with L. 46/90 (ex-Ministerial Order 37) for Italy and local laws for other countries.
- The heatable room dimensions have been suitably calculated considering the heating efficiency of the heat emitting units (radiators).
Use
- The pellets (6 mm diameter) used are good quality and not damp.
- The combustion chamber and ash pan are clean and have been placed correctly.
- The cleaning rods are operated every day.
- The heat exchange pipes and parts inside the firebox are clean.
- The pressure (read on the gauge) is about 1 bar.
REMEMBER TO VACUUM-CLEAN THE COMBUSTION CHAMBER BEFORE EACH IGNITION.
If ignition fails, do NOT repeat ignition before emptying the combustion chamber.
41
ENGLISH
sk ecoidro_multilingue_vers F 28 04 2011.qxp 29/04/2011 15.26 Pagina 42

Related product manuals