EasyManua.ls Logo

EFUN PUMA - Battery Recharge; Charging Process and Time; Battery Conservation and Temperature

EFUN PUMA
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
The battery must be charged through original onboard charger (AC-DC converter)
connected to a conventional Schuko plug (EU).
Estimated charge time (20-80%) is 3h. In case battery gets empty, charging time from
0% to 80% is 4.6h. Over 80% charge gets slower for battery longevity. Full charge may
take about 7h.
To maintain battery in optimum conservation, it is not recommended to discharge
them under 30% if not necessary. We strongly recommend charging the battery before
every use.
NMC batteries has no memory effect, therefore you don’t need to full discharge it to
achieve a good performance.
The battery chemistry is NMC configured as 72V100Ah nominal (8.4kWh). When fully
charged battery voltage is 84V.
The battery can be charged no matter the state of charge (SoC). Charging it
frequently will increase battery lifespan.
The temperature range for charging your battery is 0ºC to +35º. Do not charge the
battery under 0ºC or over 35ºC. Riding range is -15ºC to +40ºC.
BATTERY RECHARGE
Remember to keep the battery about 60% (76V) and cut off the circuit breaker when
long periods of inactivity, and keep checking battery voltage every month if possible.