EasyManua.ls Logo

Einhell Global SHZ 300-2 - Page 18

Einhell Global SHZ 300-2
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ced at a qualified workshop. When the cable is fit-
ted it is imperative that the switch-off weight (12),
for reliable limit stopping, is not forgotten.
3. You should apply a little oil to the bearing of the
return pulley (14) at regular intervals.
4. Check the smooth running of all the mechanical
parts of the winch with the equipment switched
off.
5. The device must be inspected by a qualified per-
son at least once a year. The results of the ins-
pection must be recorded in an inspection book.
18
GB
Anl. SHZ 300/500/600-13 spr. 01.02.2005 16:20 Uhr Seite 18