EasyManua.ls Logo

Electro EVOLUTION - Positioning

Default Icon
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.elecro.co.uk
2
Positioning
Your heater should be horizontally or vertically sited allowing su cient
space for pipe connections and wiring, it should be screw  xed securely to
a  rm base or wall.
NOTE: See  gure 2 for details of the foot arrangement when securing
to the wall or  oor.
The heater should be installed at a low point in the  ltration system.
It should be positioned downstream (after) of the  lter and upstream
(before) of any dosing or other water treatment plant. (see  g.3)
NOTE : If the  ow direction is reversed (explained later in this
booklet) the heater must remain sited after the  lter.
Factory set  oor
mount ‘Foot position
To reset for wall
mount option,
undo the bolts and
re-assemble in the
vertical position as
shown.
Floor mount ‘Foot position’
Wall mount ‘Foot position’
Fig 2.
ENGLISH