EasyManua.ls Logo

ELEGANT BF Series - User Manual

Default Icon
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
BF Series
20.08.26 A02
Replace the part(24),Please refer to step 5
!
BI-FOLD SHOWER DOOR:
Please scan the QR code to get the installation video.
If the QR code is invalid, please search for the title in Youtube
ELEGANT Bi-fold Shower Enclosure DIY Installment Video (BF)
Question and Answer IconNeed help?

Do you have a question about the ELEGANT BF Series and is the answer not in the manual?

Summary

General Product Information

Initial Inspection and Handling

Inspect product for transit damage upon receipt. Handle glass carefully to avoid knocks and shock loading.

Safety Glass Warning

Safety glass cannot be re-worked. Read instructions carefully before installation and handle with care.

Aftercare and Maintenance

Cleaning Guidelines

Clean shower with soap and water. Avoid abrasive cleaners and strong chemicals.

Assembly Instructions

Parts List and Identification

Comprehensive list and diagrams of all parts required for assembling the BF Series shower door.

Step 1: Initial Component Assembly

Assemble initial components using parts (11), (12), (13), (18), (19), (20).

Step 2: Wall Profile Attachment

Attach wall profiles and other fittings using parts (8), (9), (12), (13), (14), (19), (20).

Step 3: Connecting Glass Panels

Join glass panels to wall profiles (7/A), (7/B) using parts (14), (15), (19), (20).

Step 4: Lubrication and Seals

Apply lubricating oil to parts (10) and fit rubber strips (8).

Step 5: Door Height Adjustment

Adjust the door height using parts (12)/(24) for proper fitting.

Step 6: Securing Wall Channels

Fix wall channels (6) to the wall structure.

Step 7: Mounting Doors to Wall

Mount the assembled doors onto the wall channels using wall anchors (3).

Step 8: Side Panel Fixings

Secure the side panel frame with screws (5) and wall anchors (4) using drill bit Ø3.2mm.

Step 9: Attaching Decorative Covers

Fix decorative covers (4) using screws (5) and drill bit Ø3.2mm.

Step 10: Final Component Installation

Install decorative covers (21), (22) and handle components (16).

Step 11: Silicone Sealing and Curing

Apply silicone sealant on the outside edge and allow 24 hours to dry.

ELEGANT BF Series Specifications

General IconGeneral
CategoryBathroom Fixtures
MaterialBrass
InstallationSingle Hole
Water Flow1.2 GPM
FinishChrome