25.07.2014 ZUG ELEKTROMET
Before installing, please read the following Operation and Maintenance Manual and the
Warranty Card
Table of contents:
1. General information ………………………………………………… 3
2. Structure and technical data ……………………………………….... 3
3. Heater installation ………………………………………………........ 5
3.1 Assembly in tank ………………………………………........…........ 5
3.2 Electrical connections …………………………............................… 6
4. Turning on and water temperature setting …………………….......... 9
5. Overheating protection …………………………….....................……10
6. Anti-freeze protection …………………………….......................….. 10
7. Operating instructions ……………………………......……………... 10
8. Warranty conditions ……………………………………………….... 13
ENCLOSURES:
DECLARATION OF CONFORMITY
WARRANTY CARD
1. Dry operation (without water) should be strictly avoided
Place the plug in the socket
only after the tank has been filled with water. Otherwise heating elements may
become overheated and damaged, and therefore will require replacement.
2. The plug must be accessible after the heater is installed.
3. If the power cord is damaged, it should be replaced by the manufacturer or by a
specialized repair shop, or by a qualified person in order to avoid risks.