P 2500 - P 500
2
Drawing 6
1 Fastening point (10.45 x 7.99)
2 Fastening point, re-adjustable (9.06 x 7.09in)
3 Clearance for cable entry (empty conduits) (7.87 x 5.75in)
4 Drilling template
5 Foundation
6 Direction roadway
WARNING!
Danger of injury by incorrect fixation of the barrier
housing on the foundation!
Loosening of the anchor bolts from the foundation.
During the fastening of the barrier obey the minimum
distance of the heavy duty anchor to the edge of the
foundation.