EasyManua.ls Logo

EM TEST UCS 500Mx - Pulsed Magnetic Field Testing (IEC 61000-4-9); Magnetic Field Test Operation

EM TEST UCS 500Mx
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EM TEST UCS 500 Series
Operating Manual V 3.05 33 / 57
10.1.4. Pulsed magnetic field as per IEC 61000-4-9
Page 2 (Select function)
Surge Magnetic field IEC 61000-4-9
F1 : Quick Start
F2 : Magnetic field as per IEC 61000-4-9
F7 : Setup magnetic field
F1 F2 F3 F4 F5 F6 F7
The operation of the pulse magnetic field test is similar as to the standard surge routines.
Page 2 (show parameter)
QUICKSTART
H = 300A/m A = 0 dgr
+/- = + cpl = /
tr = 10s tri = Auto
n = 10
START CHANGE
F1 F2 F3 F4 F5 F6 F7
Press START and the test routines begin to work.
Press CHANGE and the actual parameters can be changed.
For magnetic field testing the antenna correction factor shall be included. The operator can enter this
factor within the setup menu under the service routine.
Setup pulsed magnetic Test field
Warning
Disconnect all power cables on the rear side at the Test supply plugs.
PF1, PF2 and N
Don’t touch the antenna during the test !