EasyManua.ls Logo

Embraer EMB145 - Page 1888

Embraer EMB145
2662 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AIRPLANE
OPERATIONS
MANUAL
POWERPLANT
REVISION 37
2-10-30
Page
3
Code
01
AOM-145/1114
STARTING BY USING GROUND EQUIPMENT
The system is pressurized by pneumatic ground equipment connected
to start the engine 2.
The SCV energizes to open when a starting switch ground signal
energizes the engine 2 start relay.
When the engine gas generator attains 53% N2, a validation time of
10 seconds elapses before the message “E2 ATS SOV OPN” appears
on the EICAS. At 56.4% N2 the FADEC sends a signal to engine 2
start relay be de-energized, thus the SCV is also de-energized and the
airflow stops flowing to the ATS turbine. In normal operation
conditions, 56.4% N2 is reached in less than 10 seconds.
The ATS turbine stops operating and the engine gas generator speed
increases.