AIRPLANE
OPERATIONS
MANUAL
NORMAL PROCEDURES
REVISION 41
1-02-05
Page
3
Code
01
Copyright © by Embraer. Refer to cover page for details.
Vortilons and Vortex Generators .................................. NUMBER AND
CONDITION
Navigation and Strobe Lights........................................ CONDITION
Static Dischargers......................................................... NUMBER AND
CONDITION
Flight Control Surfaces and Fairings ............................ CONDITION
Flaps must be retracted and spoilers closed.
Main Gear..................................................................... CHECK
Wheels and Tires..................................................... CONDITION
Gear Uplock Hook ................................................... UNLOCKED
If the uplock hook is in the LOCKED position, cycle the freefall
lever to reposition the uplock to the UNLOCKED position.
Gear Struts/Wheelwells........................................... CONDITION,
NO LEAKS
Ground Locking Pins ............................................... REMOVED
Brake Wear Indicators............................................. CHECK
Wear indicators should be no less than flush with the housing.
TAIL CONE SECTION
Air Inlets and Outlets..................................................... NO
OBSTRUCTION
Antennas....................................................................... CONDITION
Access Doors and Panels............................................. SECURED
Pylons ........................................................................... CONDITION
Engines......................................................................... CHECK
Check engines for leaks and obstructions in the air inlets.
Thrust Reverser Doors ................................................. FLUSH WITH
NACELLE
Horizontal Stabilizer ...................................................... CONDITION
Logo Lights ................................................................... CONDITION
Flight Control Surfaces ................................................. CONDITION
Static Dischargers......................................................... NUMBER AND
CONDITION
APU............................................................................... CONDITION
Pressurization Static Ports............................................ NO
OBSTRUCTION
Baggage Door............................................................... LATCHED/
LOCK PANEL
CLOSED