EasyManua.ls Logo

Embraer EMB145 - Page 252

Embraer EMB145
2662 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NORMAL PROCEDURES
AIRPLANE
OPERATIONS
MANUAL
1-02-49
Page
2
Code
01
REVISION 37
AOM-145/1114
Pressurization ............................................................... CHECKED
Verify that the digital controller was set to the destination airport
elevation.
BELOW 10000 FT
External Lights ..............................................................ON
The following lights must be turned ON upon crossing 10000 ft:
- LDG1, NOSE AND LDG2.
During night time, the LOGO light must also be turned ON.
Fasten Belts .................................................................. ON
Switch the FASTEN BELTS light upon crossing 10000 ft, if it is not
ON yet.
PC Power System (if Installed) ..................................... OFF
Below 10000 ft the PC Power System must be turned off by
pressing the PC Power button on IFE overhead panel.
Curtains......................................................................... STOWED
Any curtain used during flight must be stowed for landing.

Other manuals for Embraer EMB145

Related product manuals