EasyManua.ls Logo

Embraer EMB145 - Page 346

Embraer EMB145
2662 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUPPLEMENTARY
PROCEDURES
NAVIGATION
AIRPLANE
OPERATIONS
MANUAL
1-02-80
Page
16
Code
02
REVISION 40
AOM-145/1114
The airplane is compliant with AC 90-100A (RNAV 1 and RNAV 2) and
with TGL-10 (P-RNAV and B-RNAV).
RNAV SPECIFICATIONS
Operation
Sensors that
may be used
Guidance
FAA
Guidance
EASA
RNAV 10
(RNP 10)
(1)
2 GNSS (2) Order
8400.12A
Order
8400.12A
RNAV 5
GNSS
DME/DME
VOR/DME
AC 90-96A
(3a)
AMC 20-4
(3b)
RNAV 2 GNSS (2) AC 90-100A -
RNAV 1 GNSS (2) AC 90-100A
TGL 10
(P-RNAV)
(1) Dual FMS is required.
(2) Off Line RAIM prediction is required.
(3a) According to AC 90-96A, the airplane should be considered
eligible for B-RNAV/RNAV 5 operations if the AFM shows the
appropriate instrument flight rules (IFR) navigation system installation
has received airworthiness approval in accordance with the current
edition of AC 20-130. According to AFM, the EMB-145 RNAV system
installation is compliant with AC 20-130A.
(3b) AMC 20-4 defines that installations in accordance with AC 20-
130() is an acceptable means of compliance for Basic RNAV systems,
with no further substantiation. According to AFM, the EMB-145 RNAV
system installation is compliant with AC 20-130A.

Other manuals for Embraer EMB145

Related product manuals