EasyManua.ls Logo

Emerson Copeland EazyCool OM-15-PFJ - 3 Installation; Condensing Unit Handling; Transport and Storage

Emerson Copeland EazyCool OM-15-PFJ
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 Part No: 3125713 C6.1.2/0105-0705/E
3 Installation
The Copeland EazyCool™ condensing units are delivered with a holding charge of
neutral gas.
WA
Hig ns
on a pre
he condensing unit should be located in such a place to prevent any dirt, plastic bag,
rature, thus reduce the cooling
apacity, and lead to a high pressure switch tripping. Clean the condenser fins on a
.1 Condensing unit handling
the unit packaged u
installation.
Single fan units:
RNING
h pressure! Injury to skin and eyes possible! Be careful when opening connectio
ssurized system.
T
leaves or papers from covering the condenser and its fins.
he unit must be installed without restricting the airflow. T
A clogged condenser will increase the condensing tempe
c
regular basis.
3
3.1.1 Transport and storage
It is recommended to keep ntil final
The single fan unit, when boxed, can b
lift or pallet truck.
e handled by a fork
11
2
Storage Transport
Heaviest end
Lift here with forklift

Table of Contents

Related product manuals