EasyManua.ls Logo

Energetics ET 210 - Page 9

Energetics ET 210
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Step 2
(x8)
B
28
29
a-1
a-2
25
25
27
25
27
13
10
1
35
52R
52L
7
9
6
(d)
(e)
(a)
(b)
(c)
1. Put the upper tension cable (25) into hole of the handlebar post (10), fix the tension by a Bolt
and curved washer as Fig a-1 and Fig a-2
2. Connect upper tension cable (25) and Lower tension cable (27), upper computer cable (28) and
lower computer cable (29). Assemble the handlebar post onto the main frame (1) by curved
washer (6), spring washer (7) and allen bolt (9).
3. Assemble the Left & Right moveable supporting tube(52L&R) to Moveable handlebar support
(13) by curved washer (6), spring washer (7) and allen bolt (9).

Related product manuals