EasyManua.ls Logo

England’s Stove 25-PDVC User Manual

England’s Stove 25-PDVC
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION & OPERATION MANUAL

Manufactured By:
England’s Stove Works, Inc.
PO Box 206
Monroe, VA 24574
1
0/7
/
2
0
1
3
SAVE THESE
Pellet Stove
MODELS 25-PDVC / 55-SHP10 / 55-TRP10
SAVE THESE INSTRUCTIONS
Question and Answer IconNeed help?

Do you have a question about the England’s Stove 25-PDVC and is the answer not in the manual?

England’s Stove 25-PDVC Specifications

General IconGeneral
Weight290 lbs
Fuel TypeWood Pellets
Burn Timeup to 24 hours
Heating Capacity1, 500 sq ft
Vent TypeDirect Vent
IgnitionAutomatic

Summary

Safety Information

General Safety Warnings and Precautions

Crucial safety warnings and precautions for operation and installation.

Technical Support Overview

Letter from Technical Support Department

Introduction and overview of company support and resources.

Pre-Operation and Emergency Procedures

Before Re-Starting Your Unit

Daily checks and cleaning steps required before unit operation.

Handling Smoke-Back Incidents

Step-by-step instructions for responding to smoke-back events.

Important Installation Information

General Installation Guidelines

Key requirements for safe and compliant stove installation.

Unit Preparation and Installation Steps

Unit Preparation Steps

Tasks to perform before connecting and operating the stove.

Flue System Installation Guide

Pellet Vent Pipe Specifications

Specifications for pellet vent pipe material, size, and connections.

Through-Wall Venting Procedure

Instructions for routing the exhaust vent through a wall.

Flue System Installation Guide

Through-Ceiling Venting Guidelines

Guidelines for venting the stove through a ceiling.

Existing Flue System Integration

Procedures for connecting to existing chimneys.

Outside Air Intake Requirements

Mandatory connection of outside combustion air.

Mobile Home Installation Considerations

Special considerations for installing in manufactured homes.

Installation Clearances and Protection

Floor and Wall Protection Requirements

Requirements for protecting floors and walls from heat.

Vent Termination Clearances

External Vent Termination Distances

Required clearances for exhaust vents terminating outside the building.

Operating Instructions

Start-Up Procedures

Step-by-step guide for starting the stove.

Operating Instructions

Understanding Error Codes (E-Codes)

Explains error codes and troubleshooting steps.

Shut-Down Procedure

Correct steps for safely shutting down the unit.

Daily Operation and Scenarios

Refueling the Unit Safely

Procedures and safety for refilling the pellet hopper.

Power Outage and Fuel Outage Response

Handling power interruptions and fuel depletion.

Ash Removal and Disposal

Daily and Semi-Weekly Ash Maintenance

Routine cleaning of the burn pot and ash removal.

Ash Disposal Guidelines

Safe methods for disposing of collected ashes.

Ash Removal and Maintenance

Monthly Ash Removal and Cleaning

Tasks for monthly maintenance, including carbon removal.

Annual Stove and Flue Cleaning

Comprehensive cleaning procedures for the end of the heating season.

Maintenance Procedures

Component Service Procedures

How to service auger motors, bearings, and blowers.

Vacuum Switch System

Vacuum Switch Function and Port Maintenance

Explains the vacuum switch and how to maintain its port.

Component Maintenance and Replacement

Gasket Inspection and Replacement

Importance and schedule for checking and replacing unit gaskets.

Glass Panel Care and Replacement

Care and replacement procedures for the viewing glass.

Control Board Operation

Control Board Overview and Settings

Description of the digital control board and its settings.

Wiring Diagram and Safety Notes

Control Board Wiring Diagram

Visual representation of the unit's electrical connections.

Critical Safety Precautions

Warnings regarding moving parts, hot surfaces, and electrical shock.

Hopper Lid Latch Adjustment

Adjusting Hopper Lid Latches for Seal Integrity

How to adjust latches to ensure a tight hopper lid seal.

Available Accessories

Thermostat Installation and Operation

How to install and use an external thermostat.

Lip and Window Trim Installation

Installation guides for decorative trim accessories.

Replacement Parts and Options List

Exploded View Diagram

Pellet Stove Component Identification

Diagram identifying all parts of the pellet stove.

Troubleshooting Guide

Common Problems and Solutions

Guide to diagnosing and resolving common operational issues.

Limited 5-Year Warranty Information

Warranty Coverage and Exclusions

Details on what parts are covered, conditions, and exclusions.

Warranty Claim Procedure

Steps to follow when making a warranty claim.

Warranty Registration Process

Completing and Submitting Warranty Registration

Instructions for filling out and submitting warranty registration.