The rail is installed on the site. For more information on how to install theThe rail is installed on the site. For more information on how to install the
rail, refer torail, refer to Install RailInstall Rail..
••
The power supply for the radio is installed and tested at the radio site.The power supply for the radio is installed and tested at the radio site.
••
The site grounding system is installed and tested.The site grounding system is installed and tested.
••
Either of the Either of the following alternatifollowing alternatives must be ves must be installed and tested:installed and tested:
–– A main switch anA main switch and an external fusd an external fusee
–– A circuit breakerA circuit breaker
Introduction
Introduction
67/67/15153131-L-LZA ZA 70701 61 600001/1/1 1 UeUen n JJ || 20201717-0-06-6-0606
33