EasyManua.ls Logo

ESDDI PS-055 - Background System Installation; Tripod Installation; Crossbar Installation

ESDDI PS-055
7 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Background system installation
1. Tripod installation:
Adjust the bottom knob, unfold the tripod, and tighten the knob to adjust the height as needed.
2.Crossbar installation
The four crossbars can be assembled from 1.5 to 3 meters according to individual needs.
When assembling the crossbar, the two tubes with mounting holes must be placed
on the outermost sides of the two sides