8
Installation (continued)
Completing the installation
Connecting the power and verifying
proper operation
□ (Optional) You can make additional openings in the
cover (A) utilizing the bosses and sealing hubs (Z –
AC) provided. Use the drill locator (AD) and hole saw
guide below for the hub installation.
□ For maximum effectiveness, apply a bead of silicone
caulk to all cover, flange, and grommet sealing
surfaces.
Hole Saw Guide
□ Make sure that the cord grommet is properly inserted into the
lid. This assures a water and gas tight seal.
□ Check the pump by filling the basin with water and observe the
pump’s operation through one complete cycle.