PUMP FED INSTALLATION INSTRUCTIONS
10
IMPORTANT NOTE: It is not sufficient to support the Nexus using
just blocks underneath the feet, as this will lead to damage to
the Nexus. Incorrect installation will render the warranty invalid.
IMPORTANT PREPARATION
A solid and level base is required. It should be a minimum of 1.2m x 1.0m, to allow
easy access to valves and for maintenance purposes. The Nexus filter needs to be well
supported, this is to prevent distortion and damage when it is full of water. The best option
for this is a level, 100mm thick, concrete plinth, although decking or paving slabs would
be sufficient as long as the Nexus sits level and is not allowed to deform under the weight
of the water.
Before installation check that all the jubilee clips on the 3 x EazyConnectors are tight to
prevent leaks. These EazyConnectors can be found on the inlet, outlet and underneath the
centre chamber (this should be accessed before installation by lifting the Nexus 220).
10
Figure 6.
Figure 6.1. Figure 6.2.
Please note: a minimum of 1.2m x 1.0m
solid, level base is needed to support the
Nexus. A 100mm thick concrete plinth is
the best option. The Nexus 220 weighs
in excess of 510kg when operating and
full of water. An unlevel base will cause
irreparable damage to the unit.