EasyManua.ls Logo

Evoqua H30 - Page 17

Evoqua H30
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
.081/02-15 1-15
ITEM
DESCRIPTION INTERVAL
OIL FLUSHING
PROCEDURE FOR
EVOQUA
INTERMEDIATE
AND FINAL
HOUSINGS ONLY
Reduce loading on clarifier mechanism by lowering
sludge blanket as a minimum. It is preferred to drain
and clean tank. Stop and lock out drive motor. Drain
existing oil. Refill with a mixture of 50% Mobil Oil
Corp. Mobil System Cleaner and 50% of any gear
lube oil. Run unit for 4 hours. Stop and drain. Refill
with proper viscosity oil for anticipated weather.**
As
Required
For other gear reducers, see manufacturer's bulletins
in VENDOR INFORMATION section.
**Due to the viscosity of the oil, it can take several hours for a true reading to occur at
the sight gauge. Overfilling of oil will result in oil leaking into the collector.
D - Daily W - Weekly M - Monthly SA - Semi-Annually