EasyManua.ls Logo

F/S Manufacturing DANDY-LION KILLER - User Manual

Default Icon
2 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Tools Needed: Ratchet Wrench | 1/2” Socket | 15/16” Socket | 3/4” Socket (or Combination
Wrench) | Flat head screwdriver or 1/4” Nut Driver | 1/2” Combination Wrench
Setup Instructions:
1. INSTALL FRAME ON TANK: (Make sure the “decal side” of the tank is opposite the hitch side
of the frame - See Cover Page.) This step uses the (4) 5/16” x 1/2” Flange Bolts.
Step 1
3. INSTALL VALVE ASSEMBLY & TUBING: First, thread the Valve Assembly on to the Tru-
Kleen male snout on the tank, then thread the Manifold Supply Assembly into the 1/2”
Street Elbow on the Valve Assembly as shown above. (Do not over-tighten!)
4. INSTALL SHOCK CYLINDER & DRAG LINK: As shown above, fasten the shock cylinder
to the Mounting Frame with the quick connect pin shown at top left. Next, connect
other pin from shock cylinder into Drag Link and fasten opposite end of the Drag Link
to Mounting Frame using the 1/2” x 1 1/4” Bolt and 1/2” Lock Nut.
2. INSTALL ROLLER ARMS: Slide Roller Arms into both ends of the receiving tube on frame
as shown in Image 2. Install one 5/16” Nut on each of four 5/16” x 1” Bolts and loosely
install them into the welded nuts on the frame as shown in Image 3. (Do not tighten yet.)
Step 2
Steps 3 & 4
5. INSTALL ROLLERS: Slide rollers onto receiver
pins on Arms and Drag Link as indicated
above. (Do not tighten set bolts yet.)
Your 72 inch Dandelion Killer Should Contain:
b
c
a
d
i
e
f
k
j
g
h
l
m
a. (1) Tank
b. (2) Rollers
c. (2) Manifolds
d. (2) Tires
e. (1) Hardware Pack
f. (1) Hitch
g. (1) Mounting Frame
h. (1) Left Side Lift Arm
i. (1) Right Side Lift Arm
j. (1) Drag Link
k. (1) Right Roller Arm
l. (1) Left Roller Arm
m. (2) Manifold Links
(Identical)
y
n
r
q
p
o
s
u
t
v
x
w
Hardware Pack Contents
n. (1) Shock Cylinder
o. (4) 5/16” x 1/2” Flange Bolts
p. (2) #4 Band Clamps
q. (10) 5/16” x 1” Bolts
r. (10) 5/16” Nuts
s. (8) 5/16” Flat Washers
t. (2) 5/8” Lock Nuts
u. (3) 1/2” Lock Nuts
v. (1) 1/2” x 1 1/4” Bolt
w. (2) 1/2” Washers
x. (1) Valve Assembly (Pre-
assembled)
(1) 1/2” Micro Valve
(2) 1/2” Street Elbows
y. (1) Manifold Supply
Assembly
z. (2) Axle Bushings
Step 5
3 42
z
Question and Answer IconNeed help?

Do you have a question about the F/S Manufacturing DANDY-LION KILLER and is the answer not in the manual?

Summary

Dandelion Killer Components

Included Parts

Lists the main components of the 72-inch Dandelion Killer, including tank, rollers, manifolds, tires, hitch, and frame.

Hardware Pack Contents

Details the specific hardware included, such as bolts, nuts, washers, clamps, and valve assembly.

Setup Instructions

Step 1: Install Frame on Tank

Instructions for mounting the frame onto the tank using 5/16" x 1/2" flange bolts.

Step 2: Install Roller Arms

Guides the installation of roller arms into the frame tube and loosely attaching bolts.

Steps 3 & 4: Install Valve, Shock Cylinder & Drag Link

Details connecting the valve assembly, shock cylinder, and drag link to the main frame.

Step 5: Install Rollers

Instructions for sliding rollers onto the arms and drag link, advising not to tighten set bolts yet.

Step 6: Install Links & Manifolds

Explains how to attach manifold links, supply hose, and manifolds, securing with clamps.

Step 7: Install Lift Arms & Tires

Covers mounting lift arms, axle bushings, and tires using the specified hardware.

Step 8: Install Hitch

Details the installation of the hitch onto the mounting frame and adjusting its height.

Operating Instructions

Chemical Application Procedure

Guides on filling the tank, opening the valve for liquid flow, and optimal spray speed.

Chemical Recommendations

Suggests using Amine-based products like MCPA or 2,4-D and provides a starting mix ratio.

F/S Manufacturing DANDY-LION KILLER Specifications

General IconGeneral
BrandF/S Manufacturing
ModelDANDY-LION KILLER
CategoryPaint Sprayer
LanguageEnglish