PAGE 18
DAILY PRE-CHECK AND INSPECTION
Before each shift (every eight hours of operation), It is the operator's responsibility to carry
out the following checks and inspections before beginning operation of the sweeper:
* WARNING DEVICES: Battery condition gauge. Green "ignition-on" light.
* BATTERIES: Visually inspect connections. Look for spills & Wipe Them Up.
Use bakingsoda to neutralize spilled acid.
* CLEAN THE RECOVERY TANK. Drain it completely every day through the
drain hose. Hose out and check condition by looking in the flush-out door on
top of the tank. If still full of debris, open the cleanout door (at back of the
tank) and clean out the floor of the tank.
* CLEAN OFF MACHINE: If dusty, clean machine with compressed air. To
maintain paint, use S.C. Johnson's "Pledge" furniture polish and soft cloth, or
an equivalent product.
We do not recommend washing, and especially do not recommend
pressure washing this machine as misdirected water could damage
electricals.
IF THE MACHINE IS IN NEED OF REPAIR OR IN ANY WAY UNSAFE OR CON-
TRIBUTES TO AN UNSAFE CONDITION, THE MATTER MUST BE REPORTED
IMMEDIATELY
TO THE SHIFT SUPERVISOR. DO NOT OPERATE THE MA-
CHINE UNTIL IT IS RESTORED TO PROPER OPERATING CONDITION.