MANC03 Rev B 040320 7
5.5 Pre-Use Inspecon:
Anchor.
1.
remove the Pass-Through Anchor from service.
2.
5.6 Pass-Through Sling Anchor Installaon:
1.
hanging on one side and the small D-ring is hanging on the other. Pass the small D-ring through the large D-ring, see Figure 5. Cinch
Figure 5 - Pass-Through Anchor Installaon
Figure 6 - Installaon
2.
3.
o
as shown in
Figure 7.
Figure 7 - Load Direcon
15
o
15
o
5.7 Cable Pass-Through Sling Anchor Installaon:
1.
Figure 8 - Choke-On Anchor Installaon Figure 9 - Installaon
2.
3.
o
as shown in
Figure 10.
Figure 10 - Load Direcon
15
o
15
o