B.
Connection with
Tractor
1. Tow bar
2. Warp
3. Warp Height Adjustment Block
4. Hose Guide
Parking Jack
B.1.
Mechanical Connection
Follow the procedure steps to connect tractor
and equipment:
1.
Step: Switch the drawbar from parking position to
working position (Refer to A.4.3. Drawbar). The
drawbar switched to working position must be parallel
to the ground. Once this parallelism is achieved, the
warp is adjusted based on the dovetail of the tractor by
using the warp height adjustment block (with warp
height adjustment slots and connecting pins).
2.
Step: Switch the drawbar at a height suitable for the
connection with tractor by using the parking jack in the
front-middle section of the machine.
3.
Step: Make the pin slot on the dovetail of the tractor
and the connecting slot on the warp concentric (by
approaching at a straight angle and appropriate speed).
4.
Step: Attach the connecting pin and the spring
safety catch preventing the displacement of the pin.
5.
Step: Switch the parking jack to working position. To
do this, remove the pin retaining the jack on the frame.
Rotate the jack to a position parallel to the frame (90
degrees to the ground) and reattach the pin.
The mechanical connection of your grain drill
with tractor is completed.
Correct Tractor –
Warp Connection