Do you have a question about the FirstWatt F5 Turbo V3 and is the answer not in the manual?
Brand | FirstWatt |
---|---|
Model | F5 Turbo V3 |
Category | Computer Hardware |
Language | English |
Details the order for soldering resistors, capacitors, LEDs, VRs, JFETs, and transistors.
Solder JFETs K170/J74 and transistors Q7/Q8 after initial component soldering.
Instructions for mounting varistors and preparing the PCB for heatsink attachment.
Mount MOSFETs and MUR3020W components onto the heatsink with proper insulation.
Secure PCB screws, solder all leads, and mount varistors correctly.
Adjust P1/P2 anti-clockwise, check for shorts, and measure resistance.
Adjust P1 for voltage increase, then P2 to achieve near-zero DC offset.
Set target bias (1A-2A) by measuring voltage across R20/R23, accounting for thermal drift.
Verify mosfet matching and ensure stable bias as heat sink temperature stabilizes.