EasyManua.ls Logo

Fisher DFP08 - Assembly and Setup Guide; Arch Preparation; Connecting Arches; Final Mat Setup

Fisher DFP08
6 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Assembly and Setup
4
Lay the mat on a flat surface with the
decorated side up.
Fit the arch feet into the slots in the mat.
1
2
3
Remove the arch feet from the slots in
the mat.
• “Snap” the the peg on the arch with mobile
into the hub on the other arch.
Note: This step is a one-time assembly.
• “Snap” the leaves into the hub on the arches.