Do you have a question about the flamco Airfix D and is the answer not in the manual?
Crucial safety guidelines for installation, operation, and potential risks associated with the vessel.
Steps for initial system setup, including pre-charge pressure adjustment and gas topping up.
Instructions to check and adjust the expansion vessel's pre-charge pressure after maintenance.
Procedure for reintroducing water to the system after maintenance is complete.
Warning about the significant weight of a water-filled vessel during de-installation.
Warning that the water inside the vessel may be hot during de-installation.
Guidelines for environmentally sound disposal of the product in compliance with local regulations.
| Series | Airfix D |
|---|---|
| Application | Potable water systems |
| Maximum Working Pressure | 10 bar |
| Maximum Medium Temperature | 70°C |
| Material (Vessel) | Steel |
| Type | Diaphragm expansion vessel |
| Connection | Threaded |
| Max. operating temperature | 70°C |
| Suitable for Glycol | No |
| Approvals | WRAS |
| Material | Steel |