EasyManua.ls Logo

Flow-Rite Pro-Fill RV Edition User Manual

Default Icon
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Package Contents
A. Pro-Fill Valves (6)
B.
Flexible Manifolds (2)
C.
Quick Connect Coupler (1)
D.
Dust Cap (1)
E.
Red End Caps (9)
F. Pro-Fill Tubing (5’)
Important
they have been neglected and the
.derevoc era setalp lla os llec hcae
installing and using Pro-Fill to top
been neglected and then charging
can cause the water level to expand
in the loss of electrolyte. Once Pro-
Fill is installed, monthly topping
extremely low water level to occur.
1 2
4
the system. Do not connect more than six
3
Link manifolds/valves together with Pro-
Fill tubing. Cut the desired length of
tubing from the open end of the included
5
Cover any remaining barbs with red end
BL-189
03/14
Illustraon purposes only. Actual product is subject to change.
Remove exisng vent covers and install
Pro-Fill valves by inserng into baery
and tuning ¼ rotaon to lock into place.
Install the flexible manifold by carefully
pushing and rotang swivel tee into each
valve unl it snaps into place.
A
D
B
F
C
E
Question and Answer IconNeed help?

Do you have a question about the Flow-Rite Pro-Fill RV Edition and is the answer not in the manual?

Flow-Rite Pro-Fill RV Edition Specifications

General IconGeneral
BrandFlow-Rite
ModelPro-Fill RV Edition
CategoryWater System
LanguageEnglish

Summary

Installation

Install Pro-Fill Valves

Install Pro-Fill valves into battery cells by inserting and rotating them a quarter turn to lock.

Install Flexible Manifolds

Connect the flexible manifolds to the installed valves by pushing and rotating the swivel tee.

Link Manifolds with Tubing

Connect manifolds together using Pro-Fill tubing, cutting the tubing to the desired length.

Attach Fill Line

Attach the main fill line to an open barb, connecting up to six batteries in a series.

Apply End Caps

Cover any remaining unused barbs with red end caps to complete the installation.

Operation

Prime Squeeze Bulb

Insert the squeeze bulb filler into distilled water, prime by squeezing until filled.

Connect Supply Line

Remove dust cap and connect the water supply line to the squeeze bulb assembly via quick couplers.

Fill Battery Cells

Squeeze the bulb firmly to pump water into battery cells until all cells are full.

Disconnect and Cap

Immediately disconnect the squeeze bulb filler assembly and replace the dust cap.

Return Excess Water

Pump any remaining water from the squeeze bulb filler assembly back into the distilled water jug.