Operaon
Typical Installaon Conguraons
Important
Baeries should only be lled aer
charging.
1
Insert the squeeze bulb ller assembly
into a jug of dislled water. Prime bulb by
squeezing unl it is lled with water.
2
Remove the dust cap from the water
supply line and connect it to the squeeze
bulb ller assembly by snapping the quick
couplers together.
4
Immediately disconnect the squeeze bulb
ller assembly from the water supply line
and replace the dust cap.
3
Squeeze the bulb with rm pressure to
begin pumping water into the baery cells.
When the bulb becomes hard, all cells are
full.
5
Any water remaining in the squeeze bulb
ller assembly may be pumped back into
the dislled water jug.
BL-186
11/11
Flow-Rite Controls • 960 74th St., Byron Center, MI 49315 • phone: 616-583-1700 • fax: 616-878-5151 • www.ow-rite.com
Patent Pending
Note: For general winterizing, drain excess water in water supply line by pushing the spring loaded buon on the end of the line. To
remove the clear tubing (if necessary), pinch the tubing next to ng, carefully twist and pull straight o.
The diagrams below show typical baery arrangements and how they might be plumbed with Qwik-Fill. The leers below each diagram
indicate which Qwik-Fill Kits would be required for that conguraon. Although the tubing between baeries can be up to a distance of 8’, it
may be more desirable to have separate ll points in the front and rear of the boat.
Fill Point
Battery
Required kit