Package Contents
Installaon
Qwik-Fill On-Board Baery Watering System
Installaon and Operaon
Important
Prior to inial installaon, inspect
the exisng baery water level. If
they have been neglected and the
level is extremely low, manually ll
each cell so all plates are covered.
Then, charge the baeries, before
installing and using Qwik-Fill to top
o. Topping o a baery that has
been neglected and then charging
can cause the water level to expand
during the charging process resulng
in the loss of electrolyte. Once Qwik-
Fill is installed, monthly topping
o aer charging will prevent an
extremely low water level to occur.
1
Join two manifolds together as shown
using the appropriate size manifold jumper
for your baery group size. The manifold
jumpers are marked and can be easily cut
with a ulity knife or a pair of scissors.
2
Carefully remove your baerys exisng
caps and insert a manifold assembly into
each baery. Press each assembly rmly in
place so that it ts ush with the baery
top.
4
Connect the water supply line to one end
of the baery chain”. The 4’ of tubing
supplied may be cut to the desired length
or if a longer length is required 20’ of 1/4”
ID exible tubing is available in the Qwik-
Fill accessory pack. (sold separately)
3
Link mulple baeries together using the
clear tubing. If the baeries are separated
by several feet, allow the tubing to sag
between baeries. Ensure that the tops
of all baeries linked together are at the
same level. For opmum performance,
it is best to limit the number of baeries
connected to a single ll point to two.
5
Cover the remaining barb with a red end
cap and installaon is complete.
BL-186
11/11
Illustration purposes only. Actual product is subject to change.
Question and Answer IconNeed help?

Do you have a question about the Flow-Rite QWIK-FILL MP-2000 and is the answer not in the manual?

Flow-Rite QWIK-FILL MP-2000 Specifications

General IconGeneral
BrandFlow-Rite
ModelQWIK-FILL MP-2000
CategoryIrrigation System
LanguageEnglish

Summary

Installation Guide

Important Pre-Installation Steps

Inspect battery water levels, manually fill if low, and charge batteries before topping off.

Manifold Assembly and Linking

Join manifolds, insert into batteries, and link multiple batteries using clear tubing.

Water Supply and Finalizing

Connect the water supply line and cover the remaining barb with a red end cap.

Operation and Configurations

Important Operation Precautions

Batteries should only be filled after charging. Safety warnings about acid and gases.

Battery Filling Procedure

Insert squeeze bulb into water, prime, connect, pump into cells, disconnect, and return excess.

Winterizing and Tubing Notes

Note on draining excess water for winterizing and how to remove tubing from fittings.

Typical Installation Configurations