Package Contents
Installaon
Qwik-Fill On-Board Baery Watering System
Installaon and Operaon
Important
Prior to inial installaon, inspect
the exisng baery water level. If
they have been neglected and the
level is extremely low, manually ll
each cell so all plates are covered.
Then, charge the baeries, before
installing and using Qwik-Fill to top
o. Topping o a baery that has
been neglected and then charging
can cause the water level to expand
during the charging process resulng
in the loss of electrolyte. Once Qwik-
Fill is installed, monthly topping
o aer charging will prevent an
extremely low water level to occur.
1
Join two manifolds together as shown
using the appropriate size manifold jumper
for your baery group size. The manifold
jumpers are marked and can be easily cut
with a ulity knife or a pair of scissors.
2
Carefully remove your baery’s exisng
caps and insert a manifold assembly into
each baery. Press each assembly rmly in
place so that it ts ush with the baery
top.
4
Connect the water supply line to one end
of the baery “chain”. The 4’ of tubing
supplied may be cut to the desired length
or if a longer length is required 20’ of 1/4”
ID exible tubing is available in the Qwik-
Fill accessory pack. (sold separately)
3
Link mulple baeries together using the
clear tubing. If the baeries are separated
by several feet, allow the tubing to sag
between baeries. Ensure that the tops
of all baeries linked together are at the
same level. For opmum performance,
it is best to limit the number of baeries
connected to a single ll point to two.
5
Cover the remaining barb with a red end
cap and installaon is complete.
BL-186
11/11
Illustration purposes only. Actual product is subject to change.