EasyManua.ls Logo

fluidra Certikin CUV15V3 - User Manual

Default Icon
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION AND OPERATING MANUAL
CUV15V3, CUV25V3, CUV30V3, CUV55V3, CUV75V3, CUV110N, CUV220N
UV DISINFECTION SYSTEM
CUV-SC111020201MAN
Affix serial number here
CERTIKIN INTERNATIONAL LTD.
Witan Park, Avenue 2, Station Lane Industrial Estate, Witney, Oxfordshire, United Kingdom, OX28 4FJ
Phone: +44 (0) 1993 777200 | Fax: +44 (0) 1993 778869 | www.certikin.co.uk
WARNING:
Ensure that the unit is switched off at the mains before you attempt to conduct
any type of maintenance on the CUV.
Ensure the unit is installed in the recommended orientation.
Fit the quartz sleeves and O-rings and switch on pump to check that unit is water
tight before fitting the bulb, bulb socket and end cap, see pages 9 to 14.
• Ensure that the end cap is tight before running the unit.
After replacing bulbs or before tightening the end cap, make sure that the O-Rings
are in the correct position, and the bulb sockets are dry.
If the electrical connections get wet, dry thoroughly before switching power on.
This unit should only be installed by a qualified electrician.
UK / EU / USA