EasyManua.ls Logo

fluidra Certikin CUV15V3 User Manual

Default Icon
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION AND OPERATING MANUAL
CUV15V3, CUV25V3, CUV30V3, CUV55V3, CUV75V3, CUV110N, CUV220N
UV DISINFECTION SYSTEM
CUV-SC111020201MAN
Affix serial number here
CERTIKIN INTERNATIONAL LTD.
Witan Park, Avenue 2, Station Lane Industrial Estate, Witney, Oxfordshire, United Kingdom, OX28 4FJ
Phone: +44 (0) 1993 777200 | Fax: +44 (0) 1993 778869 | www.certikin.co.uk
WARNING:
Ensure that the unit is switched off at the mains before you attempt to conduct
any type of maintenance on the CUV.
Ensure the unit is installed in the recommended orientation.
Fit the quartz sleeves and O-rings and switch on pump to check that unit is water
tight before fitting the bulb, bulb socket and end cap, see pages 9 to 14.
• Ensure that the end cap is tight before running the unit.
After replacing bulbs or before tightening the end cap, make sure that the O-Rings
are in the correct position, and the bulb sockets are dry.
If the electrical connections get wet, dry thoroughly before switching power on.
This unit should only be installed by a qualified electrician.
UK / EU / USA
Question and Answer IconNeed help?

Do you have a question about the fluidra Certikin CUV15V3 and is the answer not in the manual?

fluidra Certikin CUV15V3 Specifications

General IconGeneral
Brandfluidra
ModelCertikin CUV15V3
CategoryLighting Equipment
LanguageEnglish

Summary

IMPORTANT SAFETY INFORMATION

PRODUCT INFORMATION

Disposal Of Your Old Product

INTRODUCING THE CERTIKIN UV DISINFECTION SYSTEM

UNBOXING THE UV

Instructions for unpacking the UV unit and identifying its components.

DIAGRAMS AND COMPONENTS LIST

IDENTIFYING THE O-RINGS

Visual guide to identifying the O-Rings for quartz sleeve and end cap sealing.

FLOW RATES

INSTALLING THE QUARTZ SLEEVE

POSITIONING AND MOUNTING THE CUV

Fitting the brackets to the CUV-110N

Specific instructions for attaching mounting brackets to the CUV-110N model.

CONNECTION TO YOUR PIPEWORK

WATER TESTING THE QUARTZ, O-RINGS AND LOCKING NUTS

CONNECTION TO THE ELECTRICITY SUPPLY

INSTALLING THE UV BULB

UV BULB REPLACEMENT

REPLACING / CLEANING QUARTZ SLEEVE

CONTROL BOX REPLACEMENT

IN BUILT PROTECTION

TROUBLE SHOOTING

FREQUENTLY ASKED QUESTIONS

GUARANTEE