Page 11 of 18
11
Do not leave the cable hanging
under the support.
13
Install the second binding, the
battery and connect the luminary
15
Assemble the PV
9
Box Energy
Labels up
Same steps as step 7.
Pass the cable under the battery.
Energy Box label should be positioned always
to upside (direction to PV).