EasyManua.ls Logo

Franklin Fueling Systems TS-LS500 User Manual

Franklin Fueling Systems TS-LS500
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TS-LS500 AUTO-LEARN
®
LINE LEAK DETECTION
INSTALLATION GUIDE
Question and Answer IconNeed help?

Do you have a question about the Franklin Fueling Systems TS-LS500 and is the answer not in the manual?

Franklin Fueling Systems TS-LS500 Specifications

General IconGeneral
ModelTS-LS500
ManufacturerFranklin Fueling Systems
ApplicationFuel Tank Monitoring
Power Supply12-24 VDC
CommunicationRS-485, Ethernet
DisplayLCD

Summary

Introduction

Definitions and Acronyms

Lists and defines abbreviations used in the manual.

Applications

Outlines the requirements for optimal line pressure for the LS500.

Site Requirements

Details minimum pressure requirements for the LS500.

TS-LSU500 Dimensions

Provides physical dimensions and connection types for the TS-LSU500.

Transducer Installation

Step-by-step guide for installing the TS-LS500 transducer.

Intrinsically Safe Installation

Explosion Proof TS-LS500E Installation

TS-LS500 Setup (Console Programming)

AC Input Module

Explains the function of the AC input module for dispenser hook signals.

4-20mA Input Module

Details the setup and parameters for the 4-20mA input module.

Relay Module

Describes the 2A and 10A relay modules and their use for STP control.

Turbine Pump Interface (TPI) Applications

Explains TPI setup and communication for line leak and STP operation.

Fuel Management Systems (FMS) Line Application Set-Up

Guide to setting up lines for leak testing with parameter configuration.

Line Status and Control Screens

TS-LS500 Status Screen

Details the status indicators and data available on the TS-LS500 status screen.

Control Section

Explains the functions for controlling line status and tests.

Learn Section

Covers starting, stopping, and monitoring the line learning process.

Pre-Operational TS-LS500 Testing

Required Equipment

Lists essential tools and components for pre-operational testing.

Purging the Line

Steps to purge air from lines before leak detection testing.

Zero Offset

Importance of setting the line pressure to zero for the learn process.

Line Stability Test

Procedure for testing line stability before the learning process.

Learn Process

When to Learn or Re-learn

Conditions and reasons for performing the learn or re-learn process.

Procedure

Step-by-step instructions for the line learning procedure.

Learn Messages

Explains various messages displayed during the learn process and their meanings.

TS-LS500 Reports

TS-LS500 Line Leak Reports

Details the content and format of TS-LS500 line leak reports.

Alarms

TS-LS500 Alarms and Warnings

Lists alarms and warnings during the learn process and operation.

Clearing Alarms

Steps to identify, diagnose, and clear console alarms.

TS-LS500 Functional Testing

Enabling/Disabling Lines

Enabling Lines

Steps to enable a line for monitoring and testing.

Disabling Line Channels

Steps to disable a line channel to stop monitoring and testing.

Control Drawing 1

Control Drawing 2

Related product manuals