EasyManua.ls Logo

FrontLine ROP16 - Anchor Positioning and Placement

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instruction Manual
BUILT TO LAST | MANUFACTURED TO COMPLY | DESIGNED TO PROTECT
1
21
FIGURE 5
Before installing the parapet anchor Frontline requires that the substrate
withstand the required 5,000 lbs minimum breaking strength and approved
before use by a qualified person. The parapet wall must be a minimum of 10” high
so that the adjustable arm lies flat and unobstructed and the parapet wall be of a
maximum width of no greater than 15”. If the parapet wall meets these criterias,
then follow the instructions below in order to proceed to installation:
1. Position the parapet’s adjustable arm and fixed arm in between the parapet
wall with the d-ring anchor facing outwards towards fall hazard as shown on
figure 5.
a. Parapet anchor needs to be straight, flush and plumed against the outer
wall.
BUILDING