EasyManua.ls Logo

Fujitsu AB*G14LVTA - Page 33

Fujitsu AB*G14LVTA
109 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
01-28
3 sec later Compressor : OFF
3 sec later Outdoor fan motor : OFF
28sec later 4WAY valve : OFF
34sec later Compressor : ON
3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time, outdoor temperature
and outdoor heat exchanger temperature as follows.
(Not defrosted for 6 or 10 minutes)
Heating operation start : Compressor ON
Outdoor HEX temp. : Over 10°C
or
Compressor ON time: Maximum 15 minutes
Defrost end
Outdoor HEX
temp.Below
-8°C
Integrating defrost
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Defrost start
Normal defrost
Outside air temp.
> 3°C
Compressor
integrating
operation:
Over 210 min.
Intermittent operation
Compressor
OFF count :
40 times
(Less than 10min.)
Continuous operation
Outdoor HEX
temp.Below
-12°C
Outside air temp.
> -1°C
Outdoor HEX
temp.Below
-14°C
Outside air temp.
> -5°C
Outdoor HEX
temp.Below
-16°C
Outside air temp.
< -5°C
For AO*G18/ 24LAT3
When the
compressor is
stopped,
If detected outside
air temp. at 2°C
=

Other manuals for Fujitsu AB*G14LVTA

Related product manuals