7. Disconnect the power supply or turn off the breaker.
NOTE: Even if the pump down operation is not stopped by pushing the switch as in step
6, the operation stops automatically after 15 minutes, and the LED light as fol-
lows.
MONITOR
POWER
ERROR
/MODE
(
GRN
) (
RED
)
A B C D E F
(3-blink)
blink
(High speed)
After completing the pump down operation, disconnect the power supply or turn
off the breaker.
If the pump down operation still continues, open the liquid pipe valve. Then per-
form the procedure again starting from step 3.
To cancel the pump down operation, push the PUMP DOWN switch (SW1) again. The indi-
cation of the LED returns to the original state which is before starting the pump down opera-
tion.
(POWER/MODE LED: On)
The pump down may stop before completion due to an error. To complete the pump down
operation, correct the error, open the liquid pipe valve and then start from step 1 again.
Otherwise, the refrigerant can be recovered from the service port.