ZINTRA
BAFFLE (V2) BOLT
INSTALLATION INSTRUCTIONS
www.baresque.com
PAGE 2
INSTALL INSTRUCTIONS
KAYA
FIXED SCREEN
2
3
a.
Insert Kaya screen into position.
Adjust feet until Kaya panel is tight.
a.
Screw and secure feet into
position with bolts.
+/- 0.38” [10mm]
b.
Pre Drill Foot (Top + Bottom)
b.
All done and ready to be used,
(Top + Bottom)
x8
TOP
BOTTOM
Screws are not included-
Installer to supply based
on-site conditions.