EasyManua.ls Logo

Func KAYA - User Manual

Func KAYA
3 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
PAGE 1
INSTALL INSTRUCTIONS
Kaya Fixed Screen install guide for all sizes.
CONTENTS
x1 Kaya Fixed Screen
Tools you will need:
• Phillips head screw driver
• Metal Saw
• Drill
a.
Max Ceiling Height Is 120” [3050mm]
Longer Tubes Available On Request
b.
Slide tubes down into the Kaya
Panel.
Aluminum Tube
x2
Tube Gliders
x4
Adjustable feet
x4
PET Panel
x1
Safety protection you will need:
• Safety Glasses
KAYA
FIXED SCREEN
1
0
x2
h
h = (Floor to ceiling height ) - 2” [50mm]
Question and Answer IconNeed help?

Do you have a question about the Func KAYA and is the answer not in the manual?

Summary

Kaya Fixed Screen Installation Guide

Tube Length Calculation and Insertion

Determine required tube length by subtracting 2 inches from ceiling height and slide tubes into the Kaya panel.

Glider Installation

Ensure tubes are within the PET panel and insert gliders flat and straight at the top and bottom of the tubes.

Adjustable Feet Installation

Insert adjustable feet and adjust them to ensure the floor to ceiling height is accommodated.

Screen Positioning and Securing

Insert the Kaya screen, adjust feet for tightness, and secure feet into position with bolts.

Func KAYA Specifications

General IconGeneral
BrandFunc
ModelKAYA
CategoryProjection Screen
LanguageEnglish