EasyManua.ls Logo

FUTURE KIT 1201 User Manual

Default Icon
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LEVEL1
http://www.futurekit.com
FUTURE KIT
FUTURE KIT
HIGH QUALITY ELECTRONIC KITS
HIGH QUALITY ELECTRONIC KIT SET FOR HOBBY & EDUCATION
R
ǧ¨Ãä¿¡ÃоÃÔº 2 ¨Ñ§ËÇÐ LED 6 ´Ç§
LED FLASHER 6 LED
CODE 1201
Technical Data
- Power supply : 9VDC.
- Electric current consumption : 12mA.
- Display : 3 red LED's and 3 green LED's
- Potentiometer
- IC board dimension : 2.04 in x 1.60 in.
Soldering Components
- Soldering Iron 25-40W.
- Soldering Iron Stand
- Diagonal Cutter
- Nose Plier
- Cutter
Precaution during PCB assembly process
1.Newcomer should work under close supervision of the teacher.
2.Read and follow all the PCB assembly instruction.
3.The exact location of all electronic components can be found on
the printed circuit board.
4.The completed assembly work must be tested corefully to avoid
damage due to components misplacement.
Soldering process
1.Put the electronic component into it's proper place on the printed
circuit board. By observing the printed detail.
2.Apply the soldering Iron tip to the leg of the component and the
pad of the circuit board simultaneously. Stay in that position for 3
seconds.
3.Feed wire core solder into the joint. Do not feed solder into the tip
while you solder.
4.Good joint should have piramid shape and not over flow to the
other joints.
5.When all soldering processes are finished, cut the protruding legs
of all components by side-cutting plier.
¢ˆÍÁÙÅ·Ò§´ˆÒ¹à·¤¹Ô¤
- 㪈áËҧ¨‡ÒÂä¿¢¹Ò´ 9 âÇÅ·ì´Õ«Õ
- ¡Ô¹¡ÃÐáÊÊÙ§ÊØ´»ÃÐÁÒ³ 12 ÁÔÅÅÔáÍÁ»ì
- ÁÕ LED áÊ´§¼Å 6 ´Ç§
- ÁÕà¡×Í¡ÁéÒäÇé»ÃѺ¤ÇÒÁàÃçÇ㹡ÒáÃоÃÔºä´é
- ¢¹Ò´á¼è¹Ç§¨Ã¾ÔÁ¾ì : 2.04 x 1.60 ¹ÔéÇ
ÍØ»¡Ã³ì·Õè¨Óà»ç¹ã¹¡ÒúѴ¡ÃÕ
- ËÑÇáȧ¢¹Ò´ 25-40 Çѵµ‹
- ·ÕèÇÒ§ËÑÇáÃé§
- ¤ÕÁµÑ´
- ¤ÕÁ¨Ñº
- ¤ÑµàµÍÃì
¢éͤÇÃÃÐÇѧ㹡ÒûÃСͺǧ¨Ã
1.ÊÓËÃѺ¼ÙˆäÁ‡ÁÕ¤ÇÒÁÃÙˆ ¤ÇÃä´ˆÃѺ¤Óá¹Ð¹Ó¨Ò¡¼ÙéÁÕ¤ÇÒÁÃÙé·Ò§´éÒ¹ÍÔàÅç¡-
·Ã͹ԡÊì
2.¤ÇÃÍèÒ¹¤ÙèÁ×Í¡è͹¡ÒûÃСͺǧ¨ÃÍÔàÅç¡·Ã͹ԡÊì·Ø¡¤Ã
Ñé§áÅзӵÒÁ
¢Ñ鹵͹ÍÂèÒ§à¤Ã觤ÃÑ´
3.µÓá˹è§ã¹¡ÒÃÅ§ÍØ»¡Ã³ì ÊÒÁÒö´Ùä´éº¹á¼è¹Ç§¨Ã¾ÔÁ¾ìËÃ×Í´Ù¨Ò¡
㹤ÙèÁ×Í¡çä´é â´Â¨ÐµéͧãÊèãËé¶Ù¡µéͧ¡ÑºµÓá˹觴éÇÂ
4.ËÅѧ¡ÒûÃСͺǧ¨ÃàÊÃç¨àÃÕºÃéÍÂáÅéÇ ãËé·Ó¡ÒõÃǨÊͺÍÕ¡¤ÃÑé§
à¾×èÍ¡Ò÷ӧҹ¢Í§Ç§¨Ã·Õè¶Ù¡µéͧáÅлéͧ¡Ñ¹¤ÇÒÁàÊÕÂËÒÂÍѹà¹×èͧÁÒ¨Ò¡
¡ÒÃãÊèÍØ»¡Ã³ì¼Ô´µÓá˹è§
ÇÔ¸Õ¡ÒúѴ¡ÃÕ
1.·Ó¡ÒÃãÊ‡ÍØ»¡Ã³ìÍ
ÔàÅç¡·Ã͹ԡÊìŧº¹á¼è¹Ç§¨Ã¾ÔÁ¾ìã¹µÓá˹觷Õè¶Ù¡
µéͧ â´ÂãÊè·Ò§´éÒ¹º¹¢Í§á¼è¹Ç§¨Ã¾ÔÁ¾ì (à»ç¹´éÒ¹·ÕèÊ¡ÃÕ¹µÑÇÍÑ¡ÉÃáÅÐ
ÅÒÂàÊé¹à»ç¹ÊÕ¢ÒÇ)
2.ãªé»ÅÒÂËÑÇáÃé§áµÐŧºÃÔàdz¢ÒÍØ»¡Ã³ìÍÔàÅç¡·Ã͹ԡÊìáÅШشºÑ´¡ÃÕ
¾ÃéÍÁ¡Ñ¹áÅéÇ ·Ôé§äÇé»ÃÐÁÒ³ 3 ÇÔ¹Ò·Õ
3.¨Ò¡¹Ñé¹ãËéãªéµÐ¡ÑèǺѴ¡ÃÕ
¨Õéŧä»àÅ硹éÍ µÐ¡ÑèǨÐàÃÔèÁÅÐÅÒÂ仵Դ·Õè
¢ÒÍØ»¡Ã³ìáÅШشºÑ´¡ÃÕ ¨Ö§Â¡ËÑÇáÃé§ÍÍ¡
4.¨Ø´ºÑ´¡ÃÕ·Õè´Õ ¤ÇèÐÁÕÅѡɳÐà»ç¹ÃÙ»»ÔÃÒÁÔ´áÅеСÑèǺѴ¡Ãըеéͧ
äÁè仫ç͵Âѧ¨Ø´ºÑ´¡ÃÕÍ×è¹
5.ËÅѧ¨Ò¡ºÑ´¡ÃÕàÊÃç¨àÃÕºÃéÍÂáÅéÇ ¡çãËéãªé¤ÕÁµÑ´·Ó¡ÒõѴ¢ÒÍØ»¡Ã³ì
ÍÔàÅç¡·Ã͹ԡÊìÍÍ¡¡çà»ç¹ÍѹàÊÃç¨
ÅÒ·ͧᴧ
á¼è¹Ç§¨Ã¾ÔÁ¾ì
ÍØ»¡Ã³ìÍÔàÅç¡·Ã͹ԡÊì
¤ÕÁµÑ´
ÅѡɳеСÑèÇ«ç͵
¨Ø´ºÑ´¡ÃÕ·Õè´Õ
ËÑÇáÃé§
µÐ¡ÑèǺѴ¡ÃÕ
¨Ø´ºÑ´¡ÃÕ
·Õè¶Ù¡µéͧ
¨Ø´ºÑ´¡ÃÕ
·ÕèäÁè´Õ
¨Ø´ºÑ´¡ÃÕ
·ÕèäÁè´Õ
ÅӴѺ¡ÒÃãÊèÍØ»¡Ã³ì
The sequence of components placement
ËÑÇáÃé§
COPPER LAYER
PHENOLIC BASE
COMPONENT
DIAGONAL
CUTTER
SHORT CIRCUIT
CORRECT
SOLDER
CORRECT
FALSE
FALSE
SOLDERING IRON
25 TO 40 WATTS
1.ãÊèÍØ»¡Ã³ì·ÕèÁÕ¤ÇÒÁÊÙ§µèÓ·ÕèÊØ´¡è͹ ÊÓËÃѺǧ¨Ã¹Õé¡ç¤×Í µÑǵéÒ¹·Ò¹ â´ÂàÃÔèÁ¨Ò¡¤ÑǵéÒ¹·Ò¹ R1 áÅÐ R4 ¡è͹ ÇÔ¸Õ¡ÒÃãÊè
ãËé·Ó¡Òç͢ҵÑǵéÒ¹·Ò¹áÅéÇ·Ó¡ÒÃàÊÕº¨¹ÊØ´ àÁ×èÍàÊÕº¤Ãº·Ñé§ 2 µÑÇáÅéÇ ¡çãËé·Ó¡ÒúѴ¡ÃÕ µÒÁËÑÇ¢éÍÇÔ¸Õ¡ÒúѴ¡ÃÕ
1.The lowest height components will be first put on. From this circuit is a resistor. Begin with R1 and R4 by bending it's 2 legs and
insert them into the holes in the circuit board before doing the soldering process (as explain before).
3.·Ó¡ÒÃãÊèµ
ÑǵéÒ¹·Ò¹»ÃѺ¤èÒä´éẺà¡×Í¡ÁéÒŧº¹µÓá˹觵ÒÁÃÙ» ¨Ò¡¹Ñé¹·Ó¡ÒúѴ¡ÃÕ µÒÁËÑÇ¢éÍÇÔ¸Õ¡ÒúѴ¡ÃÕ
3.Put the potentiometer into the place and then solder it accordingly.
4.·Ó¡ÒÃãÊè·ÃÒ¹«ÔÊàµÍÃìŧº¹µÓá˹觵ÒÁÃÙ» ¨Ò¡¹Ñé¹·Ó¡ÒúѴ¡ÃÕ µÒÁËÑÇ¢éÍÇÔ¸Õ¡ÒúѴ¡ÃÕ
4.Put transistores into their places and then solder them accordingly.
2.µÑǵéÒ¹·Ò¹µÑǵèÍä»ãËéãÊè¤èÒ R2 áÅÐ R3 ÇÔ¸Õ¡ÒÃãÊè ãËé·Ó¡Òç͢ҵÑǵéÒ¹·Ò¹áÅéÇ·Ó¡ÒÃàÊÕº¨¹ÊØ´ àÁ×èÍàÊÕº¤Ãº·Ñé§ 2 µÑÇáÅéÇ
¡çãËé·Ó¡ÒúѴ¡ÃÕ µÒÁËÑÇ¢éÍÇÔ¸Õ¡ÒúѴ¡ÃÕ
2.The next resistor to be put on are of R2 and R3 by bending it's 2 legs and insert them into the holes in the circuit board before
doing
R .....
µÑǵéÒ¹·Ò¹ (R1 áÅÐ R4)
RESISTOR (R1 and R4)
R .....
µÑǵéÒ¹·Ò¹ (R2 áÅÐ R3)
RESISTOR (R2 and R3)
VR ....K
1
2
3
VR
VR
µÑǵéÒ¹·Ò¹»ÃѺ¤èÒä´é
Ẻà¡×Í¡ÁˆÒ
TRIMMER
POTENTIOMETER
VR1
TR
·ÃÒ¹«ÔÊàµÍÃ
TRANSISTOR
NPN
B
E
C
TR
VR1
TR1
TR2
TR1, TR2
Question and Answer IconNeed help?

Do you have a question about the FUTURE KIT 1201 and is the answer not in the manual?

FUTURE KIT 1201 Specifications

General IconGeneral
BrandFUTURE KIT
Model1201
CategoryEducational Equipment
LanguageEnglish

Summary

Technical Data and Components

Precaution during PCB Assembly Process

Assembly Supervision and Instruction Following

Newcomers should work under supervision and follow all assembly instructions.

Component Location and Testing

Locate components on the PCB and test the completed assembly carefully.

Soldering Process Guide

Component Placement on PCB

Place electronic components correctly on the printed circuit board as per detail.

Soldering Iron Application

Apply soldering iron tip to component leg and pad simultaneously for 3 seconds.

Solder Feed and Joint Quality

Feed solder into joint, avoid tip feed, ensure pyramid shape joints.

Post-Soldering Trimming

Cut protruding component legs with side-cutting pliers after soldering.

Component Placement Sequence

Resistor Installation (R1, R4)

Install resistors R1 and R4 by bending legs and inserting into PCB holes.

Resistor Installation (R2, R3)

Install resistors R2 and R3 by bending legs and inserting into PCB holes.

Trimmer Potentiometer Installation

Install the trimmer potentiometer into its place and solder it.

Transistor Installation

Install transistors into their places and then solder them accordingly.

Electrolytic Capacitor Installation

Install electrolytic capacitors, paying attention to polarity.

LED Installation

Install all LEDs into their places, paying attention to polarity.

PCB Terminal Pin Installation

Install PCB terminal pins for +9V and G connections.

Battery Terminal Soldering

Solder the red wire to +9V post and black wire to G post.

Final Installation Check

Perform a final check of all installed components and soldering points.

Testing and Operation

Battery Connection

Connect the 9VDC battery terminal correctly observing polarity.

LED Flashing Observation

Observe the red and green LEDs flashing alternately.

Flashing Speed Adjustment

Adjust the flashing speed of LEDs using the potentiometer.

Circuit Repair