3
CONTENTSCONTENTS
CONTENTSCONTENTS
CONTENTS
1 INTRODUCTION1 INTRODUCTION
1 INTRODUCTION1 INTRODUCTION
1 INTRODUCTION
2 OPERA2 OPERA
2 OPERA2 OPERA
2 OPERA
TOR CONTROLSTOR CONTROLS
TOR CONTROLSTOR CONTROLS
TOR CONTROLS
3 TECHNICAL INFORMA3 TECHNICAL INFORMA
3 TECHNICAL INFORMA3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
TIONTION
TIONTION
TION
5 COMMISSIONING5 COMMISSIONING
5 COMMISSIONING5 COMMISSIONING
5 COMMISSIONING
7 F7 F
7 F7 F
7 F
AULAUL
AULAUL
AUL
T FINDINGT FINDING
T FINDINGT FINDING
T FINDING
CONTENTSCONTENTS
CONTENTSCONTENTS
CONTENTS
ImporImpor
ImporImpor
Impor
tant Informationtant Information
tant Informationtant Information
tant Information
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------- 4
Section 1 IntrSection 1 Intr
Section 1 IntrSection 1 Intr
Section 1 Intr
oductionoduction
oductionoduction
oduction
1-1 Introduction ---------------------------------------------- 5
1-2 System Layout ------------------------------------------- 8
1-3 Parts Supplied------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
1-5 Tri Core Heater Operation -------------------------------- 13
Section 2 Operator ContrSection 2 Operator Contr
Section 2 Operator ContrSection 2 Operator Contr
Section 2 Operator Contr
olsols
olsols
ols
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
2-6 Servicing ------------------------------------------------ 22
Section 3 TSection 3 T
Section 3 TSection 3 T
Section 3 T
echnical Informationechnical Information
echnical Informationechnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 InstallationSection 4 Installation
Section 4 InstallationSection 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 CommissioningSection 5 Commissioning
Section 5 CommissioningSection 5 Commissioning
Section 5 Commissioning
5-1 Commissioning ----------------------------------------- 47
Section 6 ServicingSection 6 Servicing
Section 6 ServicingSection 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault FindingSection 7 Fault Finding
Section 7 Fault FindingSection 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & SafetyHealth & Safety
Health & SafetyHealth & Safety
Health & Safety
------------------------------------------------------------
------------------------------------------------------------
------------------------------ Inside Front Cover
6 SERVICING6 SERVICING
6 SERVICING6 SERVICING
6 SERVICING
4 INST4 INST
4 INST4 INST
4 INST
ALLAALLA
ALLAALLA
ALLA
TIONTION
TIONTION
TION
IMPORTANT
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
HEALHEAL
HEALHEAL
HEAL
TH & SAFETYTH & SAFETY
TH & SAFETYTH & SAFETY
TH & SAFETY
31
4-1 Building Control
INSTINST
INSTINST
INST
ALLAALLA
ALLAALLA
ALLA
TION 4TION 4
TION 4TION 4
TION 4
Note
In some areas it is a criminal offence to
install an unvented hot water storage
system without notifying the local authority,
or without the relevant licence.
4-1.1 Water System
To install an Electrastream Heating System the installer must be fully competent, suitably
qualified and hold a relevant unvented certificate and any applicable licence that may be
required by the local inspectorate for installation of an unvented hot water storage
system.
In some areas the Local Authority may require notification by means of a building notice
or by the submission of full plans for the proposed installation of an unvented hot water
storage system.
4-1.2 Water Regulations
The
WW
WW
W
ater Bye-laws ater Bye-laws
ater Bye-laws ater Bye-laws
ater Bye-laws and
Curr Curr
Curr Curr
Curr
ent Building Rent Building R
ent Building Rent Building R
ent Building R
egulations egulations
egulations egulations
egulations (paying particular attention to G3
and Part L 1 & 2) and
HSEHSE
HSEHSE
HSE requirements should be considered when installing an
Electrastream System.
4-2 Electrical
4-2.1 Electrical Regulations
All wiring should be carried out to and comply with the currAll wiring should be carried out to and comply with the curr
All wiring should be carried out to and comply with the currAll wiring should be carried out to and comply with the curr
All wiring should be carried out to and comply with the curr
ent IEE Wiring Rent IEE Wiring R
ent IEE Wiring Rent IEE Wiring R
ent IEE Wiring R
egulations.egulations.
egulations.egulations.
egulations.
All electrical work must comply with any rAll electrical work must comply with any r
All electrical work must comply with any rAll electrical work must comply with any r
All electrical work must comply with any r
elevant relevant r
elevant relevant r
elevant r
egulations that apply at the time of theegulations that apply at the time of the
egulations that apply at the time of theegulations that apply at the time of the
egulations that apply at the time of the
installation.installation.
installation.installation.
installation.
All cables should be to the latest BS6004 specification.All cables should be to the latest BS6004 specification.
All cables should be to the latest BS6004 specification.All cables should be to the latest BS6004 specification.
All cables should be to the latest BS6004 specification.
All flexes should be to the latest BS6500 specification.All flexes should be to the latest BS6500 specification.
All flexes should be to the latest BS6500 specification.All flexes should be to the latest BS6500 specification.
All flexes should be to the latest BS6500 specification.
All cables and flexes must be of corrAll cables and flexes must be of corr
All cables and flexes must be of corrAll cables and flexes must be of corr
All cables and flexes must be of corr
ect size as stated on the wiring diagrams.ect size as stated on the wiring diagrams.
ect size as stated on the wiring diagrams.ect size as stated on the wiring diagrams.
ect size as stated on the wiring diagrams.
IMPORTANT
Using incorrect cable size will invalidate warranty.
Loose connections will result in overheating, arcing and possibly fire.
ENSURE ALL CONNECTIONS ARE TIGHT.
4-2.2 Electrical Work
All electrical installation and maintenance of the Electrastream must be carried out by a
competent qualified installer.
All electrical work must be installed to the requirements of this User and Installation
Manual.
4-2.3 Electrical Supply
The main incoming electrical supply to the property should be of adequate voltage,
current and temperature rating for the requirements of the Electrastream as well as all
other electrical requirements within the property.
The electrical supply to which the Electrastream is connected must be protected by a
63 amp RCD.
The Electrastream must have a dedicated 40 amp MCB.
The Electrastream must be wired through a 40A class A, double pole isolating switch with
at least 3mm pole separation, this switch should also have both electric and mechanical
indicators. The switch should be located near to the Electrastream control unit.
Note
The Electrastream MCB may require a
ventilation space between it and other
MCBs within the consumer unit.
IMPORTANT
No electrical components, switches
or junction boxes should be
positioned near or under the
Tundish.