CONTENTS
1 INTRODUCTION1 INTRODUCTION
1 INTRODUCTION1 INTRODUCTION
1 INTRODUCTION
2 OPERA2 OPERA
2 OPERA2 OPERA
2 OPERA
TOR CONTROLSTOR CONTROLS
TOR CONTROLSTOR CONTROLS
TOR CONTROLS
3 TECHNICAL INFORMA3 TECHNICAL INFORMA
3 TECHNICAL INFORMA3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
TIONTION
TIONTION
TION
5 COMMISSIONING5 COMMISSIONING
5 COMMISSIONING5 COMMISSIONING
5 COMMISSIONING
7 F7 F
7 F7 F
7 F
AULAUL
AULAUL
AUL
T FINDINGT FINDING
T FINDINGT FINDING
T FINDING
CONTENTSCONTENTS
CONTENTSCONTENTS
CONTENTS
ImporImpor
ImporImpor
Impor
tant Informationtant Information
tant Informationtant Information
tant Information
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------- 4
Section 1 IntrSection 1 Intr
Section 1 IntrSection 1 Intr
Section 1 Intr
oductionoduction
oductionoduction
oduction
1-1 Introduction ---------------------------------------------- 5
1-2 System Layout ------------------------------------------- 8
1-3 Parts Supplied------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
1-5 Tri Core Heater Operation -------------------------------- 13
Section 2 Operator ContrSection 2 Operator Contr
Section 2 Operator ContrSection 2 Operator Contr
Section 2 Operator Contr
olsols
olsols
ols
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
2-6 Servicing ------------------------------------------------ 22
Section 3 TSection 3 T
Section 3 TSection 3 T
Section 3 T
echnical Informationechnical Information
echnical Informationechnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 InstallationSection 4 Installation
Section 4 InstallationSection 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 CommissioningSection 5 Commissioning
Section 5 CommissioningSection 5 Commissioning
Section 5 Commissioning
5-1 Commissioning ----------------------------------------- 47
Section 6 ServicingSection 6 Servicing
Section 6 ServicingSection 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault FindingSection 7 Fault Finding
Section 7 Fault FindingSection 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & SafetyHealth & Safety
Health & SafetyHealth & Safety
Health & Safety
------------------------------------------------------------
------------------------------------------------------------
------------------------------ Inside Front Cover
6 SERVICING6 SERVICING
6 SERVICING6 SERVICING
6 SERVICING
4 INST4 INST
4 INST4 INST
4 INST
ALLAALLA
ALLAALLA
ALLA
TIONTION
TIONTION
TION
IMPORTANT
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
HEALHEAL
HEALHEAL
HEAL
TH & SAFETYTH & SAFETY
TH & SAFETYTH & SAFETY
TH & SAFETY
47
COMMISSIONING 5COMMISSIONING 5
COMMISSIONING 5COMMISSIONING 5
COMMISSIONING 5
5-1 Commissioning
The Commissioning Procedure should be carried out in 10 stages.
Stage 1 Electrical Check. Stage 6 Heating System Pre-fill Check
Stage 2 DHW Pre-fill Check. Stage 7 Flushing and Filling Heating System
Stage 3 Filling DHW System Stage 8 Setting and Testing Controls
Stage 4 Drain DHW System Stage 9 Accumulator Pressure
Stage 5 Cleaning DHW System Stage 10 Handing Over
Commissioning Procedure
STAGE 1 - ELECTRICAL CHECK
1.11.1
1.11.1
1.1
CHECK THAT ALL WIRING INCLCHECK THAT ALL WIRING INCL
CHECK THAT ALL WIRING INCLCHECK THAT ALL WIRING INCL
CHECK THAT ALL WIRING INCL
UDING EARUDING EAR
UDING EARUDING EAR
UDING EAR
TH WIRING, HAS BEEN INSTALLEDTH WIRING, HAS BEEN INSTALLED
TH WIRING, HAS BEEN INSTALLEDTH WIRING, HAS BEEN INSTALLED
TH WIRING, HAS BEEN INSTALLED
CORRECTLCORRECTL
CORRECTLCORRECTL
CORRECTL
YY
YY
Y
, CONFORMS TO CURRENT REGULATIONS AND A SATISFACTORY, CONFORMS TO CURRENT REGULATIONS AND A SATISFACTORY
, CONFORMS TO CURRENT REGULATIONS AND A SATISFACTORY, CONFORMS TO CURRENT REGULATIONS AND A SATISFACTORY
, CONFORMS TO CURRENT REGULATIONS AND A SATISFACTORY
ELECTRICAL TEST AND INSPECTION CERELECTRICAL TEST AND INSPECTION CER
ELECTRICAL TEST AND INSPECTION CERELECTRICAL TEST AND INSPECTION CER
ELECTRICAL TEST AND INSPECTION CER
TIFICATE HAS BEEN COMPLETED.TIFICATE HAS BEEN COMPLETED.
TIFICATE HAS BEEN COMPLETED.TIFICATE HAS BEEN COMPLETED.
TIFICATE HAS BEEN COMPLETED.
1.21.2
1.21.2
1.2
CHECK TRI-CORE HEATER COCHECK TRI-CORE HEATER CO
CHECK TRI-CORE HEATER COCHECK TRI-CORE HEATER CO
CHECK TRI-CORE HEATER CO
VER, ELECTRASTREAM CONTROLLER COVER, ELECTRASTREAM CONTROLLER CO
VER, ELECTRASTREAM CONTROLLER COVER, ELECTRASTREAM CONTROLLER CO
VER, ELECTRASTREAM CONTROLLER CO
VER ANDVER AND
VER ANDVER AND
VER AND
ALL OTHER ELECTRICAL COALL OTHER ELECTRICAL CO
ALL OTHER ELECTRICAL COALL OTHER ELECTRICAL CO
ALL OTHER ELECTRICAL CO
VERS ARE CORRECTLVERS ARE CORRECTL
VERS ARE CORRECTLVERS ARE CORRECTL
VERS ARE CORRECTL
Y FITTED.Y FITTED.
Y FITTED.Y FITTED.
Y FITTED.
1.3 Check Tundish is positioned so that any spillage or spray from the Tundish would
not contact any electrical components.
1.4 Check ALL wiring connections have been made.
Check cylinder temperature sensor is connected to temp sensor terminals 3 & 4.
Check cylinder over temperature cut-out is connected to O-T terminals 1 & 2 (see
figs. 3-3a and 3-3b).
1.5 Check the required earth continuity conductors have been fitted.
STAGE 2 - DHW PRE-FILL CHECK
2.1 Check the hot water heating discharge pipes and Tundish are correctly installed to
conform to the Building Regulations G3.
2.2 Check all pipe connections are tight and no joints have been left unsoldered.
2.3 Check ALL drain cocks are closed.
2.4 If fitted, check that the Scale Protection Device or Water Softener has been fitted
according to manufacturers instructions.
STAGE 3 - FILLING DHW SYSTEM
3.1 Open all shut off valves.
3.2 Open the incoming water isolating valve (mains stopcock) to the Electrastream and
allow the unit to fill.
3.3 Open all domestic taps in turn to purge air.
3.4 Check system for leaks including around the Tri-Core Heater.
3.5 Check no water is discharging from any TPRV or PRV.
3.6 Test the operation of the TPRV and PRV by turning the manual test cap and ensure
the water flows freely and safely to waste.
3.7 Test the operation of the Combination Valve PRV by turning the manual test cap and
ensure the water flows freely and safely to waste.
3.8 Set hot water Mixing Valve to max.
STAGE 4 - DRAIN DHW SYSTEM
4.1 Turn off incoming water isolating valve (mains stop cock).
4.2 Using hose and suitable containers, drain all water from the cylinder and pipework
using drain cocks. The cylinder will not fully drain without the use of a hose - see
page 36.
Note
DHW = Domestic Hot Water.
IMPORTANT It is the responsibility
of the installer to ensure that the
Electrastream System is properly
commissioned.
Should the commissioning not be
carried out, then the manufacturers
guarantee and any extended
warranty, will become null and
void.
The Guarantee Form MUST be
completed and returned to GAH
(HEATING PRODUCTS) in the
prepaid envelope provided.