Do you have a question about the Gainsborough 10.5 cse and is the answer not in the manual?
Ensures safety and compliance with water supply and electrical regulations.
Explains PRD's role in pressure protection and operational warnings.
Details on using 15mm push-fit connectors and inlet bung removal.
Emphasizes turning off power, using qualified persons, and earthing.
Requirements for RCDs, double-pole isolating switches, and zoning.
Chart for selecting cable size, MCB, or fuse based on shower power rating.
Instructions for connecting wires to the terminal block securely.
Installation must be earth bonded per regulations; may need extra bonding cable.
Detailed procedure for commissioning the shower before use, including water flow and temperature checks.
Diagnosing issues like button failure, cover fit, or low water flow.
| Brand | Gainsborough |
|---|---|
| Model | 10.5 cse |
| Category | Plumbing Product |
| Language | English |