EasyManuals Logo

Gallagher M800 User Manual

Gallagher M800
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
English
Gallagher 3E4412 Value Mains Energizer NA User Manual
10
5-Step Installa on Guide
Install the earth system at least 10m (33 ) from any power supply earth peg,
underground telephone or power cable. Drive one 2m (6 ) earth stake into the
ground, un l only 5cm (2”) remain above the ground.
Step 3. Connect the fence
Connect the energizers red (FENCE)
terminal to the fence using double
insulated cable. Remove 5cm (2”) of
plas c coa ng from one end of the
cable. Bend the end of the wire to
form a loop. Unscrew the red (FENCE)
terminal and insert the loop of wire.
Screw the terminal closed, ensuring
the wire is fi rmly clamped. A ach the
other end of the cable to the fence
using a joint clamp.
Step 4. Plug the energizer
into a power outlet
Check that the light on the front of
the energizer is fl ashing.
Red
Green
To fence
To earth
Note: Poor grounding can cause
interference on telephone lines,
radios and televisions. This can be
recognised by a clicking sound on
telephones.
Light

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gallagher M800 and is the answer not in the manual?

Gallagher M800 Specifications

General IconGeneral
BrandGallagher
ModelM800
CategoryPower Supply
LanguageEnglish

Related product manuals