Submittal
#
144200-2-0-GH
Flad Submittal Number
(414)577-1177
144200-2-0-GH
14 42 00
Contractor Submittal Number
Specification Section
Brian Schneider
Attention
University of Wisconsin - Kenwood IRC Greenhouse
Milwaukee, WI
Project Name
Project Location
We Are Sending
X
Herewith
Next Day
UPS - Ground
Under Separate Cover
Second Day Air
X
Email/FTP Site
Hand Deliver
Received by:
Date/Time:
Hold for Pick-Up
Received by:
Date/Time:
No. of
Copies
Description Approved
Approved
as
Noted
Not
Subject to
Review
Revise/
Resubmit
Rejected/
Resubmit
Approved
as Noted/
Resubmit
Reviewed
Only/No
Approval
Action
Required
1
Greenhouse - O&M - ADA Wheelchair lift
X*
RETURNED VIA
SUBMITTAL EXCHANGE.
NO HARD
COPIES TO FOLLOW.
*Approved as noted - see review comments
Remarks/Copies
Flad CA File (1)
Dottie Dwyer
By
P:\UW_MILWAUKEE\10846-03\CONST\CORRESPONDENCE\CONTRACTOR\TRANSMITTAL\130919_DD_144200-2-0-GH.DOCX
Question and Answer IconNeed help?

Do you have a question about the Garaventa Lift Genesis Series and is the answer not in the manual?

Garaventa Lift Genesis Series Specifications

General IconGeneral
TypeVertical Platform Lift
ApplicationCommercial and residential
Travel HeightUp to 14 feet
Capacity750 lbs
Platform Size (W x D)36" x 48"
Power Supply120V AC, 60Hz
ComplianceASME A18.1, CSA B355
Safety Featuresemergency stop

Summary

Description of Controls

Call Stations

Details on various types of call stations for lift operation.

Operation Instructions

Safety First!

Essential safety precautions for operating the lift and avoiding hazards.

Calling the Lift to Your Landing

Step-by-step guide on how to call the platform to the desired landing.

Entering and Exiting the Lift

Procedures for safely entering and exiting the lift platform.

Traveling Inside the Lift

Instructions on how to operate the lift controls while on the platform.

Manual Travel

Manual Lowering (Leadscrew Models)

Procedures for manual lowering using handwheel and access cap on leadscrew models.

Trouble Shooting

Preventive Maintenance

General Lift Maintenance

Critical Maintenance Procedures

Leadscrew Inspection and Rust

Detailed inspection of leadscrew for wear, noise, and rust issues.

Drive Nut Inspection

Procedures for inspecting the drive nut for wear and common issues.

Safety Nut and Switch Inspection

Inspecting the safety nut and its associated switch for proper function and wear.

Component Maintenance Checks

Slack Chain Safety Device Inspection

Verifying the slack chain safety device function and electrical cut-out switch.

Safety Device and Landing Limit Checks

Testing the safety device and adjusting landing limits for proper operation.

Screw Drive PM Checklist

Hydraulic Drive PM Checklist

Drive Nut Replacement (Genesis I)

Lead Screw Removal/Replacement (Genesis I)

Drive Nut Replacement (Genesis 2006)

Lead Screw Removal/Replacement (Genesis 2006)

Screw Removal Procedure

Step-by-step guide for removing the lead screw from the mast.

Screw Installation Procedure

Steps for installing the new lead screw, including tensioning and greasing.

Cylinder Head/Seal Replacement

Replacement Procedure

Detailed steps for replacing the cylinder head and seal, emphasizing cleanliness.

Hydraulic Lowering Valve Replacement (Genesis 2006)

Hydraulic Lowering Valve Replacement (Genesis I)

Related product manuals