Do you have a question about the GasTech 24kW Baykan Starplus and is the answer not in the manual?
Handbook directives are integral and supplementary part of the product.
Check cut-off valves, air, gas suitability, leakages, electrical connections, flammable materials, and fume pipe.
Step-by-step guide for initial boiler startup and troubleshooting.
Instructions on how to adjust tap water temperature.
Instructions on how to adjust central heating system temperature.
Guide for initial startup and ignition troubleshooting for the device.
Instructions on adjusting tap water temperature for the device.
Instructions on adjusting heating system water temperature.
Steps for the initial ignition of the device and troubleshooting.
How to adjust the tap water temperature, displayed on screen 3.
How to adjust heating system water temperature, observed on display screen 3.
Procedure for turning the wall hung boiler off and its anti-freezing system.
Recommendations for installing and operating the device with an external thermostat.
Troubleshooting for ignition failure or blocked boiler.
Indicates a broken air pressure measurer, blocking ignition.
Heating thermostat malfunction due to age, requiring service.
Tap water thermostat inefficiency requiring service.
Indicates insufficient system pressure (below 0.6 bars).
Safety thermostat activation due to high primary system water temperature.
Indicates delivered water temperature exceeds 90°C, causing temporary shutdown.
Appears for modulator malfunction, boiler continues working.
Indicates circulator malfunction or failure.
General guidelines for installing and placing wall hung boilers.
Specific instructions for mounting B type boilers with flue ducts.
Illustrates requirements for air inlet space for ventilation.
Guidelines for placing hermetic C type wall hung boilers.
Instructions for mounting the boiler to the wall, including spacing.
Steps for connecting water and gas lines to the boiler.
Guidelines for connecting the boiler's electrical supply.
Instructions for connecting a room thermostat to the device.
Steps for filling the heating system for the Sun model.
Steps for filling the heating system for Star, Starplus, and Moon models.
Emphasizes the critical role of the flue duct for efficient operation.
Specific requirements for B11BS type devices with open chambers.
Guidelines for using collective fume pipes for multiple boilers.
Specific requirements for Type C devices with closed chambers.
Illustrates the operational flow and components of the wall hung boiler.
Lists modifications that must not be made to the boiler or its surroundings.
Steps to follow if gas leakage is detected.
Warnings about using or storing explosive/flammable materials near the device.
Specific requirements for the electrical supply connection.
General guidelines for the maintenance of the wall hung boiler.
Explains the meaning of various symbols and signs used in the manual.
Lists certifications and conformity with international directives.
Loading...