Do you have a question about the GE HEALTHCARE Monitor UV-900 and is the answer not in the manual?
Brand | GE HEALTHCARE |
---|---|
Model | Monitor UV-900 |
Category | Laboratory Equipment |
Language | English |
Provides instructions for safe handling of the Monitor UV-900 system.
Crucial information for users regarding safe operation, intended use, and prerequisites.
Details regulations and standards applicable to the Monitor UV-900 system.
Lists European directives the product fulfills, including Machinery, EMC, and RoHS directives.
Provides regulatory information for compliance with Eurasian Customs Union technical regulations.
Covers FCC compliance and CAN ICES/NMB compliance for US and Canadian markets.
Details environmental conformity and machinery/electrical equipment standards.
Lists accompanying documentation, including User Manual and Declaration of Conformity.
Covers general safety, flammable liquids, personal protection, installation, and operation safety.
Explains system labels and their meanings, including warning and disposal symbols.
Details procedures for emergency shutdown and response to power failure.
Outlines steps for decontamination, disposal, and recycling of the instrument.
Provides pollution control information and explanation of the hazardous substance label.
Provides a visual overview of the main unit components and their functions.
Details the connectors and switches on the rear panel of the main unit.
Describes the design, features, and optional flow cells for the UV monitor.
Explains the functional diagram and working principle of the UV monitor.
Details the Xenon flash lamp and monochromator system's operation.
Explains the function of the blocking filter in wavelength selection.
Describes how the light is split for sample and reference beams and detected.
Explains the detection system, ensuring high sensitivity and stability.
Describes how the instrument automatically calibrates the stepper motor for wavelength selection.
Instructions for unpacking the instrument and checking for damage.
Specifies environmental and operational requirements for instrument placement.
Guidance on safely disconnecting and preparing the equipment for transport.
Details adding essential parts like the flow cell and optical fibers to the instrument.
Step-by-step instructions for installing the 2 mm and 10 mm UV flow cells.
Instructions for connecting the optical fibers, with a warning about UV light.
Step-by-step guide for connecting the tubing to the flow cell.
Instructions for fitting the cell holder cover.
Guidance on connecting power and signal cables to the instrument.
Details on connecting the instrument to an external chart recorder.
Instructions for connecting computers or other auxiliary equipment.
Describes connecting the monitor via UniNet for control with UNICORN software.
Steps for safely connecting the instrument to the mains power supply.
Step-by-step guide for powering on the instrument and initiating self-test.
How to interpret and display absorbance readings for different wavelengths.
Guide to navigating menus, selecting options, and adjusting settings using the dial and buttons.
Illustrates the menu structure and navigation flow within the instrument.
Explains how to navigate back to the main operating menu using the ESC button.
Details how to adjust numerical values using the selection dial and cursor.
Provides a detailed overview of the instrument's main menu options and their functions.
Instructions for controlling the lamp status to conserve operating time.
Guide to setting and changing measurement wavelengths for the UV monitor.
Explains how to perform an autozero operation for accurate absorbance readings.
Configures the instrument's analog output for external chart recorders.
Describes how to insert event marks on a chart recorder for data logging.
Explains how to use the moving average filter for noise reduction and peak distortion.
Instructions for replacing the flow cell to adjust measurement sensitivity.
Guidance on calibrating the UV flow cell for accurate protein concentration measurements.
Steps for preparing the instrument and computer for UV cell calibration.
Procedure for measuring absorbance values using test solutions for calibration.
How to input the real cell length and serial number after calibration.
Details on how the instrument restarts and its status after a power interruption.
Ensures a clean environment for service personnel before maintenance work.
Instructions for regular cleaning of the instrument's exterior surfaces.
Outlines periodic maintenance tasks and their recommended intervals.
Procedure for cleaning the instrument's internal parts, especially the flow cell.
Procedures for checking key instrument parameters like lamp intensity and flip time.
How to check the UV lamp intensity and when replacement is needed.
Procedure to check the total operating time of the UV lamp.
Explains what 'flip time' refers to and how to check it for maintenance.
Detailed steps for cleaning the flow cell and optical connectors for optimal performance.
Step-by-step guide for cleaning the UV flow cell using detergent and distilled water.
Instructions on how to clean the optical fiber connectors using isopropanol.
Guidance on storing the instrument and flow cell overnight or for longer periods.
Information on what to state when contacting GE for support.
Lists common faults, their possible causes, and corrective actions.
Catalog of error messages, their descriptions, and recommended actions.
Details operating data such as wavelength range, accuracy, and linearity.
Provides detailed operating parameters for the UV monitor, including noise and drift.
Lists physical characteristics like light source, dimensions, power, and display.
Specifications for the 2 mm and 10 mm UV flow cells, including pressure and resistance.
Form for declaring the instrument is clean and safe for on-site service.
Guidance and form for ensuring equipment is safe before on-site service.
Form and instructions for ensuring equipment is safe before product return or servicing.
References the User Manual for a complete overview of all instrument menus.
Information and listing of available accessories and spare parts for the UV-900.
Lists available UV flow cells with their quantities and code numbers.
Details the signal cable for connecting to a recorder.
Lists available calibration kits for the UV-900 instrument.
Lists various tubing and connector types with quantities and code numbers.
Lists tools available for instrument maintenance and assembly, like the fiber detachment tool.
Provides information on how and where to order parts and accessories.